Family-owned roofing contractor · From the Beaches to Clay County
Hablamos español FL Lic. CCC1337027 Call (904) 337-9606
Top-down view of a finished 7V roof replacement
How we build

The 7V Standard.
Seven steps. Zero shortcuts.

Every roof we install follows the same documented process. Every step happens on every job. This is what we mean when we say one standard.

Why it exists

A process is not a checklist.
It is a commitment.

Most roofing contractors do not publish their process, because publishing it means being held to it. We wrote the 7V Standard down specifically so we could be.

Seven steps. None of them optional. None of them skipped based on job size, weather, timeline, or how busy we happen to be. If you are paying for a roof, you are getting the full process: documented, permitted, and warranted.

The seven steps

What happens on every job.

01

Assessment

Before we quote anything, we get on your roof and assess its real condition: shingles, flashing, gutters, penetrations, ventilation, and deck condition where accessible. You get an honest, straight answer about where your roof stands.

Free for everyone, every time
02

Estimate

Everything we found, and everything we propose to do about it, goes in writing. You will know what materials are being used, what labour is included, and what the scope covers before you sign anything. No verbal estimates and no ranges.

03

Permit

We pull a building permit with your local municipality before we touch your roof. It protects your home's value, it puts the work on record, and it keeps us accountable for the installation.

No permit, no start date
04

Tear-Off & Deck Evaluation

The old roofing material comes off completely. Then the deck is checked board by board, and damaged or rotted decking is replaced before anything goes over it. Deck replacement terms are set out in advance, so there is no surprise change order on job day.

05

System Installation

The Owens Corning Duration shingle system installed in the correct sequence: drip edge, underlayment, ice & water shield at the vulnerable points, starter strip, shingles, proper flashing at every penetration, valley and transition, then ridge cap.

An owner is on the job, leading the crew
06

Cleanup

Magnetic sweep for nails, debris removal, gutters cleared, and a final walkthrough. Your property should look better than when we arrived. Cleanup is part of the job, not an extra.

07

Warranty

At project completion you receive two documents: the Owens Corning Standard Product Limited Lifetime Warranty on the materials, and the 7V 10-Year Limited Workmanship Warranty on the installation.

Both warranties provided in writing
Step one is free.
Call (904) 337-9606
What it means for you

Why the process matters
more than the price.

The 7V Standard is not a sales tool. It is a protection layer for the homeowner. Here is what each part actually does.

The permit protects your investment

When you sell your home, unpermitted work creates title problems. A pulled permit means the work is on record, signed off, and legally documented.

The deck evaluation extends roof life

A new roof installed over damaged decking will fail early no matter how good the shingles are. Catching deck damage before installation is how a long-life roof actually lasts.

The warranty is only as good as the install

Manufacturer warranties are voided by improper installation. Our workmanship warranty exists because we stand behind how the roof was built, not just what is on it.

The process in photos

One roof, start to finish.

Aerial view of a 7V roof tear-off underway with the yard protected by blue tarps
Step 04 · Tear-offThe old roof comes off. Yard and walkways tarped first.
7V crew checking and replacing roof deck boards during a tear-off
Step 04 · Deck checkEvery deck board checked before anything new goes on.
The finished 7V roof replacement with new gray architectural shingles
Steps 05–07 · FinishedInstalled in sequence, cleaned up, and both warranties handed over.
Free roof assessment

See the process
on your own roof.

Step one is free, and it is the same step on every job. Scheduling is by phone.

Call (904) 337-9606
Call (904) 337-9606